Baselined Interim Release 8, 8.1, 8.2, 8.3, 8.4, 8.5 and 8.6 Design Artefacts
You can view the historical Baselined Design Artefacts for Interim Release 8, 8.1, 8.2, 8.3, 8.4, 8.5 and 8.6 in the respective libraries below.
We have listed these Artefacts in their own libraries to support participant engagement with the Artefacts.
For more information, or if you have any questions, please email Design@mhhsprogramme.co.uk
Interim Release 8.6
On Monday 25 November 2024 the Programme published Interim Release 8.6.
This release contains changes to DES138 and changes to Advanced Data Service (ADS) Validation Estimation.
None of these updates affect Swagger.
Programme participants are expected to conduct their own risk assessment against IR8.56 and execute their own appropriate regression testing without the need to formally Pre-Integration Test (PIT) report against it.
Full details of the issues addressed are covered in the Release Note below:
Release Note for Interim Release 8.6
We have published the Artefacts in their own library below to support participant engagement with the Artefacts.
For more information or if you have any questions, please email Design@mhhsprogramme.co.uk
Short Name | Doc Number | Sub Type | Status | Version |
---|---|---|---|---|
Interface Catalogue | DES138 | Interface Specifications | v5.8.6 | |
ADS Validation Estimation Method Statement | METH002 | Method Statements | 5.7 |
Interim Release 8.5
On Wednesday 6 November 2024 the Programme published Interim Release 8.5.
This release contains design updates following the approval of CR056: Batching of Electricity Registration Data Service (ERDS) to Central Switching Service (CSS) Agent Appointment Files, and corrects four defects that were identified in SIT Functional Testing that are currently blocking test execution.
The Programme will issue guidance on the 'effective from' date of these updates via the testing coordinators.
None of these updates affect Swagger.
Programme participants are expected to conduct their own risk assessment against IR8.5 and execute their own appropriate regression testing without the need to formally Pre-Integration Test (PIT) report against it.
Full details of the issues addressed are covered in the Release Note below:
Release Note for Interim Release 8.5
We have published the Artefacts in their own library below to support participant engagement with the Artefacts.
For more information or if you have any questions, please email Design@mhhsprogramme.co.uk
Short Name | Doc Number | Sub Type | Status | Version |
---|---|---|---|---|
DEL1712 - MHHS Impacts to BSC owned Data Flows | DEL1712 | Unclassified | Draft | v1.2 |
Interface Catalogue | DES138 | Interface Specifications | Draft | v5.8.5 |
Operational Choreography | OPC001 | Method Statements | Draft | v5.5 |
D0398 - MHHS Supplier Settlement Header Report | D0398 | Draft | v1.2 |
Interim Release 8.4
On Wednesday 16 October 2024 the Programme published Interim Release 8.4.
This release contains an update to the Design (DES-138) addressing a specific defect preventing the IF-036 not being issued for Linked / Related Meter Point Administration Numbers (MPANs) and blocking several test cases. The Programme will advise on the ‘effective from’ date for the update in due course.
This release does not introduce any new functionality but does address specific identified errors that are causing failures in testing.
The updates will only impact Meter Point Registration Service (MPRS) and Data Integration Platform (DIP) services.
Programme participants are expected to conduct their own risk assessment against IR8.4 and execute their own appropriate regression testing without the need to formally PIT report against it.
Full details of the issues addressed are covered in the Release Note below:
Short Name | Doc Number | Sub Type | Status | Version |
---|---|---|---|---|
Interface Catalogue | DES138 | Unclassified | Draft | v5.8.4 |
Interim Release 8.3
On Wednesday 18 September 2024 the Programme published Interim Release 8.3.
This release contains a number of changes which, mainly, include updates to Swagger and DES-138. Importantly, IR8.3 will not introduce any new functionality but will address specific identified errors that are likely to cause future failures in testing.
This release does not introduce any new functionality but does address specific identified errors that are likely to cause future failures in testing.
Programme participants are expected to conduct their own risk assessment against IR8.3 and execute their own appropriate regression testing without the need to formally PIT report against it.
All Programme participants should use reasonable endeavours to align SIT-B systems to IR8.3 by 7 October 2024, to re-commence Settlement Testing. If Programme participants are unable to do so, please use IR8.2 and update to IR8.3 as soon as possible, at a suitable point before 21 October 2024 (for SIT-A alignment).
The Data Integration Platform (DIP) will be operating aligned to IR8.2 in SIT-B as of 7 October 2024 and updated to IR8.3 for 21 October 2024, aligned to SIT-A.
Full details of the issues addressed are covered in the Release Note below:
Interim Release 8.2
On Wednesday 21 August the Programme published Interim Release 8.2. This release contains eight Design Issue Notifications (DINs).
This release does not introduce any new functionality but does address specific identified errors that are likely to cause future failures in testing.
Programme participants are expected to conduct their own risk assessment against IR8.2 and execute their own appropriate regression testing without the need to formally PIT report against it.
Programme participants will need to incorporate these updates before starting SIT Functional Cycle 3.
Full details of the issues addressed are covered in the Release Note below:
Baselined Interim Release 8.2 Design Artefacts
Short Name | Doc Number | Sub Type | Status | Version |
---|---|---|---|---|
Physical interfaces - Real Common Blocks | E2E003 | Technical Design | 1.8.2 | |
Physical interfaces - Event Codes | E2E003 | Technical Design | 1.8.2 | |
Physical interfaces - ECS Common Blocks | E2E003 | Technical Design | 1.8.2 | |
Physical interfaces - Submit Events | E2E003 | Technical Design | 1.8.2 | |
End to End Solution Architecture | E2E001 | Technical Design | v3.8 | |
Interface Catalogue | DES138 | Interface Specifications | v5.8.3 | |
ECS Reports | ERI011B | Interface Specifications | v5.8 | |
Physical interfaces - ECS Reports | E2E003 | Technical Design | 1.8.2 | |
Physical interfaces - Data Catalogue | E2E003 | Technical Design | 1.8.2 | |
Physical interfaces - Event Codes | E2E003 | Technical Design | 1.8.2 | |
Physical interfaces - ECS Reports | E2E003 | Technical Design | 1.8.2 | |
Physical interfaces - Data Catalogue | E2E003 | Technical Design | 1.8.2 | |
LSS_Method_Statement | METH005 | Method Statements | v5.3 | |
ADS_Validation_Estimation | METH002 | Method Statements | v5.6 | |
Physical interfaces - Real Common Blocks | E2E003 | Technical Design | 1.8.2 | |
MDS_Method_Statement | METH007 | Method Statements | v5.5 | |
Physical interfaces - ECS Common Blocks | E2E003 | Technical Design | 1.8.2 | |
Physical interfaces - Data Types | E2E003 | Technical Design | 1.8.2 | |
Physical interfaces - Submit Events | E2E003 | Technical Design | 1.8.2 | |
UMSDS_EM_Functions | METH004 | Method Statements | v5.4 | |
SDS_Validation_Estimation | METH001 | Method Statements | v5.5 | |
Physical interfaces - Submit Events | E2E003 | Technical Design | 1.8.2 | |
VAS_Method Statement | METH006 | Method Statements | v5.4 | |
Physical interfaces - Submit Events | E2E003 | Technical Design | 1.8.2 |
Interim Release 8.1
On Wednesday 12 June 2024, the Programme published Interim Release 8.1 Design Artefacts.
Interim Release 8.1 contains 47 Design Issue Notifications (DINs), correcting errors in various Design Artefacts and defects in Swagger ahead of the upcoming Systems Integration Testing (SIT) Cycle 3 and Qualification Testing.
This release doesn't introduce any new functionality but does address specific identified errors that are likely to cause future failures in testing.
Programme participants are expected to conduct their own risk assessment against IR8.1 and execute their own appropriate regression testing without the need to formally Pre-Integration Test (PIT) report against it.
Programme participants will need to incorporate these updates before starting SIT Functional Cycle 3.
Full details of the issues addressed are covered in the accompanying Release Note below:
Release Note for Interim Release 8.1
Baselined Interim Release 8.1 Design Artefacts
Short Name | Doc Number | Sub Type | Status | Version |
---|---|---|---|---|
Migration Design Requirements Log | DEL974 | Business Requirements | Draft | v1.2 |
DIP API & Webhook Response Guidance | Supporting Document | Draft | v3.0 | |
ECS Reports - External | ERI011B | Interface Specifications | Draft | v5.7 |
Change of Registration Data Business Process Descriptions | BPD010 | Business Process Descriptions | Draft | v5.3 |
Physical interfaces - Interfaces Event Codes - json | E2E003 | Technical Design | Draft | v1.8.1 |
Physical interfaces - Data Types - json | E2E003 | Technical Design | Draft | v1.8.1 |
LDSO Overview Requirements | BRS005 | Business Requirements | Draft | v5.3 |
Migration Design Document | DEL961 | Supporting Document | Draft | v1.4 |
Physical interfaces - ECS Common Blocks - yaml | E2E003 | Technical Design | Draft | v1.8.1 |
D-Flow and Interface Mapping | DES196 | Technical Design | Approved | v0.3 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Draft | v1.8.1 |
SDS Validation Estimation Method Statement | METH001 | Method Statements | Draft | v5.4 |
Supplier Overview Requirements | BRS004 | Business Requirements | Draft | v5.5 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Draft | v1.8.1 |
ADS Validation Estimation Method Statement | METH002 | Method Statements | Draft | v5.5 |
Physical interfaces - Submit Events - json | E2E003 | Technical Design | Draft | v1.8.1 |
LSS Method Statement | METH005 | Method Statements | Draft | v5.2 |
Change of Registration Data Business Process | BP010 | Business Process Diagrams | Draft | v5.5 |
Physical interfaces - Submit Events - yaml | E2E003 | Technical Design | Draft | v1.8.1 |
Physical interfaces - Real Common Blocks - yaml | E2E003 | Technical Design | Draft | v1.8.1 |
End to End Solution Architecture | E2E001 | Technical Design | Draft | v3.7 |
Interface Catalogue | DES138 | Interface Specifications | Draft | v5.8.2 |
Change of Energisation Business Process | BP008 | Business Process Diagrams | Draft | v5.2 |
Registration Service Requirements | BRS003 | Business Requirements | Draft | v5.7 |
End to End Non Functional Requirements | E2E002 | Technical Design | Draft | v3.4 |
Physical interfaces - ECS Reports - json | E2E003 | Technical Design | Draft | v1.8.1 |
Physical interfaces - Interfaces Event Codes - yaml | E2E003 | Technical Design | Draft | v1.8.1 |
Physical interfaces - Data Catalogue - json | E2E003 | Technical Design | Draft | v1.8.1 |
Physical interfaces - Data Catalogue - yaml | E2E003 | Technical Design | Draft | v1.8.1 |
Physical interfaces - ECS Reports - yaml | E2E003 | Technical Design | Draft | v1.8.1 |
ISD Entities | EDI021 | Supporting Document | Draft | v5.7 |
Physical interfaces - Data Types - ysml | E2E003 | Technical Design | Draft | v1.8.1 |
Physical interfaces - Real Common Blocks - json | E2E003 | Technical Design | Draft | v1.8.1 |
Physical interfaces - ECS Common Blocks - json | E2E003 | Technical Design | Draft | v1.8.1 |