Qualification Background

The Qualification phase of the Programme is in place to assess whether Programme participants that plan to operate in MHHS, have the appropriate systems, processes and controls in place to undertake the Balancing & Settlement Code (BSC) and Retail Energy Code (REC) requirements for the MHHS Design. 

In summary, the high-level Qualification evidence requirements include: 

  1. PIT DBT1: Evidence PIT completion to enter Qualification Testing which will prove specific functional, non-functional and migration related characteristics of systems and processes.
  2. SIT/Qualification Testing: Participants are expected to complete either SIT or Qualification Testing, and document evidence in the Qualification Assessment Document (QAD). 
  3. Placing Reliance: A policy for placing reliance was consulted on to reduce unnecessary duplication of effort for participants when completing the evidencing testing as set out in the 'Placing Reliance' policy. If this policy is  applied, evidence to support it should be provided in the QAD, applying the principles set out in the policy.
  4. Procedural and Governance: All participants are expected to adhere to the processes and procedures of the Code Bodies to fulfil the requirements of the role; evidence for this will be documented in the QAD. ​​​​​​​

Pre-Qualification Submission

All Non-SIT Suppliers, Supplier Agents and Meter Equipment Managers (MEMs), and New Entrant Licensed Distribution System Operator (LDSO) Programme participants are required to provide a Pre-Qualification Submission for MHHS Qualification.

This submission deadline was 26 April 2024 and you can find more information on this, on the Pre-Qualification Submission page of this website.

Any changes to previous submissions or new entrant submissions should be made as soon as possible.

qualification_tick.jpg

gantt_chart.jpg

Qualification Plans

Programme participants can find the latest Qualification plans in Appendix C of the Qualification Approach & Plan which you can find on the Qualification Approach & Plan page of this website.


Retail Energy Code (REC), Balancing & Settlement Code (BSC) and Data Integration Platform (DIP) Qualification Assessment Criteria for MHHS Qualification

To help participants to understand MHHS Qualification under the REC, BSC and DIP, the REC Code Manager, Elexon and the DIP Manager have produced documents detailing their respective assessment criteria for Qualification. 

These criteria are governed under the REC, BSC and DIP Rules, and are hosted on the REC Portal and Elexon website.

All participants, irrespective of their Qualification journey, can use these criteria to gain insight into the approach that the REC, BSC and the DIP Manager have taken to ensure coverage of MHHS requirements during Qualification. 

You can view the latest BSC Criteria in the Qualification Assessment Criteria library below.

To view the latest REC Assessment Criteria, please click on the link below to the REC Portal, where you will be required to sign-in. The REC Assessment Criteria is listed under the MHHS section.

REC Portal

To view the latest DIP Assessment Criteria which has now been incorporated into the DIP Rules, please visit the DIP page of the Elexon website.

blue clock

Qualification Assessment Criteria

Short Name Doc Number Subtype Theme Version
BSC Assessment Criteria for Qualification v5.0 n/a Approach and Plan Assessment Criteria 5.0

sand.jpg

End-to-End (E2E) Sandbox 

The End-to-End (E2E) Sandbox Guidance document was previously issued for industry consultation.

This document sets out the scope for the Sandbox and outlined the key principles supporting the creation, set up and operation of the Sandbox test environment for optional use by Programme participants.

On Tuesday 27 May 2025 the MHHS Programme published the End-to-End (E2E) Sandbox Test Data Approach and Plan for industry consultation.

This document defines a test data approach and provides a view of specific data requirements to support Sandbox Testing in the User Integration Testing (UIT) Environment.

You can view more information on these documents on the E2E Sandbox Guidance page of this website.


MHHS Qualification Planning Video

The Code Bodies have published the MHHS Qualification Planning Video for all Programme participants to use.

The video walks through the Qualification process and provides all the information needed to complete MHHS Qualification.

You can view the video via the link below:

MHHS Qualification Planning Video

Video.jpg

security.jpg

PIT Evidence Obfuscation

Code Bodies have published guidance on PIT Evidence Obfuscation on the PIT Evidence Obfuscation page of this website.


Qualification Pre-Integration Testing (PIT) Data Integration Platform


Code Bodies have published guidance on PIT DIP Simulator usage. 

Find out more on the Qualification PIT DIP Simulator Guidance page of this website.

online2.jpg

documents.jpg

Qualification Artefacts

You can find specific information including Test Scenarios and Test Cases, consultations and template deliverables, relating to the relevant roles below:

Below, you can find more information on the SIT participant route through Qualification: